Requirement Details
Electron Ion Collider
P-EIS-METL-INST-BPM.05
Requirement details, history, relationships and interfaces associated with requirement P-EIS-METL-INST-BPM.05
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 02/13/2025 19:28 | |||
Identifier: | P-EIS-METL-INST-BPM.05 | WBS: | 6.03.03.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The BPM pick-up alignment accuracy with respect to to its nearby quadrapole magnet shall be better than 100 µm | ||
Comments: |
Record Date: 01/28/2025 17:40 | |||
Identifier: | P-EIS-METL-INST-BPM.05 | WBS: | 6.03.03.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The BPM pick-up alignment accuracy with respect to to its nearby quadrapole magnet shall be better than 100 μm | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-EIS-METL-INST-BPM.5 | WBS: | 6.03.03.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The BPM pick-up alignment accuracy with respect to to its nearby quadrapole magnet shall be better than 100 µm | ||
Comments: |
Parents | |
F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
F-EIS-METL-INST.1 | To measure and control the beam in the medium energy 400 MeV transfer line there shall be sufficient beam position monitors for orbit control, transverse profile monitors, and bunch charge monitors as required. |
Children | |
No children. |
This function not yet implemented.