Requirement Details
Electron Ion Collider
F-EIS-LINAC-BNCHR-INST-EM.1
Requirement details, history, relationships and interfaces associated with requirement F-EIS-LINAC-BNCHR-INST-EM.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 03/17/2025 17:06 | |||
Identifier: | F-EIS-LINAC-BNCHR-INST-EM.1 | WBS: | 6.03.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Not Applicable | |
Description: | To characterize the beam as it exits the buncher section, there shall be an emittance monitor(EM), at the exit of the 3rd harmonic buncher cavity to measure beam position, the beam emittance during commissioning. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-EIS-LINAC-BNCHR-INST-EM.1 | WBS: | 6.03.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | On Hold | |
Description: | To characterize the beam as it exits the buncher section, there shall be an emittance monitor(EM), at the exit of the 3rd harmonic buncher cavity to measure beam position, the beam emittance during commissioning. | ||
Comments: |
Parents | |
G-EIS.2 | The EIS shall provide an electron beam having sufficient energy to meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.3 | The EIS shall provide an electron beam with the RMS bunch momentum spread at extraction which meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.4 | The EIS pre-injector shall provide an electron beam to the ESR having a horizontal beam emittance which is compatible with operation of the ESR. |
G-EIS.5 | The EIS pre-injector shall provide an electron beam to the ESR having a vertical beam emittance which is compatible with operation of the ESR. |
G-EIS.6 | The EIS shall inject into the ESR at a rate of 1[Hz]. |
G-EIS.7 | The EIS shall inject one bunch into the ESR whilst being able to provide 1 bunch per injection cycle. |
G-EIS.8 | The EIS shall provide an electron beam to the ESR having RMS Bunch lengths at extraction to meet beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.9 | The EIS shall provide an electron beam to the ESR having the bunch charge at extraction to meet the beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.10 | The EIS bunch replacement process shall deliver polarized replacement bunches capable of creating all the ESR polarization patterns needed to meet the physics goals. |
Children | |
P-EIS-GUN-INST-EM.01 | Emittances shall be measured using a profile monitor and a dedicated upstream quadrupole configured to measure H, V, and skew profiles. |
P-EIS-GUN-INST-EM.03 | The EM shall be able to measure the expected normalized emittance of 40 um |
P-EIS-GUN-INST-EM.02 | Before the 400 MeV beam goes into the spin rotator, the emittance shall be measured by a quad scan |
P-EIS-GUN-INST-EM.04 | Beam emittance shall be measured in the low energy diagnostics beamline using a slit scanner and profile monitor |
This function not yet implemented.