Requirement Details
Electron Ion Collider
F-EIS-HETL-INST-IC.1
Requirement details, history, relationships and interfaces associated with requirement F-EIS-HETL-INST-IC.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-EIS-HETL-INST-IC.1 | WBS: | 6.03.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Not Applicable | |
Description: | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain FCT and an Integrating Current Transformer before the ESR injection septum. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-EIS-HETL-INST-IC.1 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain FCT and an Integrating Current Transformer before the ESR injection septum. | ||
Comments: |
Record Date: 03/17/2025 17:06 | |||
Identifier: | F-EIS-HETL-INST-IC.1 | WBS: | 6.03.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Not Applicable | |
Description: | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain FCT and an Integrating Current Transformer before the ESR injection septum. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-EIS-HETL-INST-IC.1 | WBS: | 6.03.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain FCT and an Integrating Current Transformer before the ESR injection septum. | ||
Comments: |
Parents | |
G-EIS.2 | The EIS shall provide an electron beam having sufficient energy to meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.3 | The EIS shall provide an electron beam with the RMS bunch momentum spread at extraction which meet the ESR beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.4 | The EIS pre-injector shall provide an electron beam to the ESR having a horizontal beam emittance which is compatible with operation of the ESR. |
G-EIS.5 | The EIS pre-injector shall provide an electron beam to the ESR having a vertical beam emittance which is compatible with operation of the ESR. |
G-EIS.6 | The EIS shall inject into the ESR at a rate of 1[Hz]. |
G-EIS.7 | The EIS shall inject one bunch into the ESR whilst being able to provide 1 bunch per injection cycle. |
G-EIS.8 | The EIS shall provide an electron beam to the ESR having RMS Bunch lengths at extraction to meet beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.9 | The EIS shall provide an electron beam to the ESR having the bunch charge at extraction to meet the beam requirements as set forth in the MPT. [Document#:EIC-SEG-RSI-005] |
G-EIS.10 | The EIS bunch replacement process shall deliver polarized replacement bunches capable of creating all the ESR polarization patterns needed to meet the physics goals. |
Children | |
P-EIS-HETL-INST-CM.01 | An ICT and FCT shall be installed near the end of the transfer line. |
P-EIS-HETL-INST-CM.02 | The bunch charge shall be measured with an accuracy better than <1 % |
P-EIS-HETL-INST-CM.03 | The bunch charge shall be measured with the resolution of 10 pC |
P-EIS-HETL-INST-CM.05 | The FCT shall provide measurements of the bunch patterns being transported to the RCS. |
P-EIS-HETL-INST-CM.04 | The bunch charge monitor shall be used to measure transport efficiency of the Line |
P-EIS-HETL-INST-CM.06 | The FCT shall provide measurements of the bunch patterns being transported to the ESR |
This function not yet implemented.