Requirement Details
Electron Ion Collider
F-EIS-HETL-INST-IC.1
Requirement details, history, relationships and interfaces associated with requirement F-EIS-HETL-INST-IC.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 14:48 | |||
Identifier: | F-EIS-HETL-INST-IC.1 | WBS: | 6.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain FCT and an Integrating Current Transformer before the ESR injection septum. | ||
Comments: |
No archive versions
Parents | |
G-EIS.2 | The EIS shall provide an electron beam having sufficient energy to meet the ESR beam requirements as set forth in [5.9]. |
G-EIS.3 | The EIS shall provide an electron beam with the RMS bunch momentum spreads at extraction which meet the ESR beam requirements as set forth in [5.9]. |
G-EIS.4 | The EIS pre-injector shall provide an electron beam to the ESR having a horizontal beam emittance which is compatible with operation of the ESR. |
G-EIS.5 | The EIS pre-injector shall provide an electron beam to the ESR having a vertical beam emittance which is compatible with operation of the ESR. |
G-EIS.6 | The EIS shall inject into the ESR at a rate of 1[Hz]. |
G-EIS.7 | The EIS shall inject one bunch into the ESR whilst being able to provide 2 bunches per injection cycle. |
G-EIS.9 | The EIS shall provide an electron beam to the ESR having the bunch charge at extraction to meet the beam requirements as set forth in [5.9]. |
G-EIS.8 | The EIS shall provide an electron beam to the ESR having RMS Bunch lengths at extraction to meet beam requirements as set forth in [5.9]. |
G-EIS.10 | The ESR bunch replacement pattern will be defined by 1.the required polarization pattern to be provided to the experiments, 2.decay rates and 3. The RF cogging limitations of the beam transfer between RCS and ESR. |
Children | |
P-EIS-HETL-INST-CM.1 | An ICT and FCT shall be installed near the end of the transfer line. |
P-EIS-HETL-INST-CM.2 | The bunch charge shall be measured with an accuracy better than <1 % |
P-EIS-HETL-INST-CM.3 | The bunch charge shall be measured with the resolution of 10 pC |
P-EIS-HETL-INST-CM.4 | The bunch charge monitor shall be used to measure transport efficiency of the Line |
P-EIS-HETL-INST-CM.5 | The FCT shall provide measurements of the bunch patterns being transported to the RCS. |
P-EIS-HETL-INST-CM.6 | The FCT shall provide measurements of the bunch patterns being transported to the ESR |
This function not yet implemented.