Requirement Details
    Electron Ion Collider
     - P-EIS-HETL-INST-BPM.07- Requirement details, history, relationships and interfaces associated with requirement P-EIS-HETL-INST-BPM.07 
 CURRENT RECORD CURRENT RECORD
 ARCHIVE RECORDS ARCHIVE RECORDS
 RELATIONSHIPS RELATIONSHIPS
 INTERFACES INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | P-EIS-HETL-INST-BPM.07 | WBS: | 6.03.03.04 | 
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPMs shall be used as input for beam trajectory correction and/or feedforward to optimize transmission efficiency | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | P-EIS-HETL-INST-BPM.07 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The BPMs shall be used as input for beam trajectory correction and/or feedforward to optimize transmission efficiency | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | P-EIS-HETL-INST-BPM.07 | WBS: | 6.03.03.04 | 
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | In Process | |
| Description: | The BPMs shall be used as input for beam trajectory correction and/or feedforward to optimize transmission efficiency | ||
| Comments: | |||
| Parents | |
| F-EIS-HETL-INST-BPM.1 | For instrumentation purposes the high energy TL from the RCS to the ESR shall contain a number of strategically placed Beam Position Monitors at the quadrupoles and at the entry and exit of a number of the dipoles as required. | 
| F-EIS-INST.1 | EIS shall have all the beam instrumentation necessary to deliver the operational parameters set forth in the MPT. [Document#:EIC-SEG-RSI-005] | 
| Children | |
| No children. | |
This function not yet implemented.