Requirement Details
Electron Ion Collider
P-EIS-GUN-INST-EM.3
Requirement details, history, relationships and interfaces associated with requirement P-EIS-GUN-INST-EM.3
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 09/25/2024 16:11 | |||
Identifier: | P-EIS-GUN-INST-EM.3 | WBS: | 6.03.04.02.06 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | In Process | |
Description: | The EM shall be able to measure the expected normalized emittance of 40 um | ||
Comments: |
No archive versions
Parents | |
F-EIS-LINAC-BNCHR-INST-EM.1 | To characterize the beam as it exits the buncher section, there shall be an emittance monitor(EM), at the exit of the 3rd harmonic buncher cavity to measure beam position, the beam emittance during commissioning.  |
Children | |
No children. |
This function not yet implemented.