Requirement Details
Electron Ion Collider
F-DET.14
Requirement details, history, relationships and interfaces associated with requirement F-DET.14
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 10/11/2023 00:00 | |||
Identifier: | F-DET.14 | WBS: | 6.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The sub-systems and their support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
No archive versions
Parents | |
G-DET.10 | The detector systems must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
G-DET.9 | The detector and its sub-systems will be functionally integrated with one another, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET.1 | The EIC central detector shall require a region free of interaction region magnets and other large collider equipment of at least 4.5 m in the backward and 5m in the forward direction around the interaction point. |
This function not yet implemented.