Requirement Details
Electron Ion Collider
F-DET.11
Requirement details, history, relationships and interfaces associated with requirement F-DET.11
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 10/11/2023 00:00 | |||
Identifier: | F-DET.11 | WBS: | 6.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The detector and its sub-systems will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
Comments: |
No archive versions
Parents | |
G-DET.10 | The detector systems must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
G-DET.9 | The detector and its sub-systems will be functionally integrated with one another, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET-DAQ.1 | All DAQ powered services in the experimental hall and counting house must have access to either 120V AC or 208V AC three phase power. |
P-DET-DAQ.2 | All DAQ services in the experimental hall must have access to a "clean" ground to maintain good signal quality. |
P-DET-DAQ.6 | DAQ Room computing shall require electrical power via raised floor distribution sufficient to support XX kW total power usage levels. |
P-DET-DAQ.7 | DAQ Room computing shall require HVAC cooling via raised floor distribution sufficient to support a XX kW power outlay at tempuratures at or below 76 degrees Fahrenheit. |
This function not yet implemented.