Requirement Details
Electron Ion Collider
P-DET-TRAK.3
Requirement details, history, relationships and interfaces associated with requirement P-DET-TRAK.3
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | P-DET-TRAK.3 | WBS: | 6.10.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The tracking system shall provide power supplies for bias and low voltages. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | P-DET-TRAK.3 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The tracking system shall provide power supplies for bias and low voltages. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-DET-TRAK.3 | WBS: | 6.10.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The tracking system shall provide power supplies for bias and low voltages. | ||
Comments: |
Parents | |
F-DET-TRAK.4 | The tracking system will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. |
F-DET-TRAK.6 | The tracking system and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET.11 | The detector and its sub-systems will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. |
F-DET.14 | The sub-systems and their support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
Children | |
No children. |
This function not yet implemented.