Requirement Details
Electron Ion Collider
P-DET-TRAK.3
Requirement details, history, relationships and interfaces associated with requirement P-DET-TRAK.3
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/11/2023 00:00 | |||
Identifier: | P-DET-TRAK.3 | WBS: | 6.10.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The tracking system shall provide power supplies for bias and low voltages. | ||
Comments: |
No archive versions
Parents | |
F-DET.12 | The detector and its sub-systems will require adequate infrastructure capabilities (i.e. crane capacity, floor loading, physical space, etc.) to effectively support operations and maintenance. |
F-DET.9 | Something for forward hadron acceptance. |
Children | |
No children. |
This function not yet implemented.