Requirement Details
Electron Ion Collider

F-DET-TRAK.7
Requirement details, history, relationships and interfaces associated with requirement F-DET-TRAK.7
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-DET-TRAK.7 | WBS: | 6.10.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | A structural support infrastructure must be provided that supports the weight of the tracking system and peripheral equipment, and safely distributes that load to the ground. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-DET-TRAK.7 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | A structural support infrastructure must be provided that supports the weight of the tracking system and peripheral equipment, and safely distributes that load to the ground. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-DET-TRAK.7 | WBS: | 6.10.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | A structural support infrastructure must be provided that supports the weight of the tracking system and peripheral equipment, and safely distributes that load to the ground. | ||
| Comments: | |||
| Parents | |
| G-DET-TRAK.4 | The tracking system will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
| G-DET-TRAK.5 | The tracking system must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
| Children | |
| P-DET-TRAK.8 | The tracking system will require a structural support system to carry the cumulative weight of the detectors and peripheral services, and to distribute that load to other supporting infrastructure or to the floor. |
This function not yet implemented.