Requirement Details
Electron Ion Collider
F-DET-TRAK.6
Requirement details, history, relationships and interfaces associated with requirement F-DET-TRAK.6
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-TRAK.6 | WBS: | 6.10.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The tracking system and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
No archive versions
Parents | |
G-DET-TRAK.4 | The tracking system will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-TRAK.5 | The tracking system must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-TRAK.2 | The tracking system shall provide cooling (air/liquid) for silicon sensors. |
P-DET-TRAK.3 | The tracking system shall provide power supplies for bias and low voltages. |
P-DET-TRAK.4 | The tracking system shall provide a gas mixing system for gaseous detectors. |
P-DET-TRAK.5 | The tracking system will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-TRAK.7 | The tracking system will require communications infrastructure to support data collection, monitoring and control. |
P-DET-TRAK.6 | The tracking system will require electrical power to support the operation of the detector sub-components and electronics. |
P-DET-TRAK.9 | The tracking system must fit within the constraints of the surrounding detector sub-systems and have adequate space for the delivery of services and the removal of waste. |
This function not yet implemented.