Requirement Details
Electron Ion Collider
F-DET-TRAK.4
Requirement details, history, relationships and interfaces associated with requirement F-DET-TRAK.4
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-TRAK.4 | WBS: | 6.10.03 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The tracking system will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
Comments: |
No archive versions
Parents | |
G-DET-TRAK.4 | The tracking system will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET-TRAK.2 | The tracking system shall provide cooling (air/liquid) for silicon sensors. |
P-DET-TRAK.3 | The tracking system shall provide power supplies for bias and low voltages. |
P-DET-TRAK.4 | The tracking system shall provide a gas mixing system for gaseous detectors. |
P-DET-TRAK.6 | The tracking system will require electrical power to support the operation of the detector sub-components and electronics. |
P-DET-TRAK.5 | The tracking system will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-TRAK.7 | The tracking system will require communications infrastructure to support data collection, monitoring and control. |
This function not yet implemented.