Requirement Details
Electron Ion Collider
F-DET-POL.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-POL.5
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-POL.5 | WBS: | 6.10.14 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The polarimeters and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
No archive versions
Parents | |
G-DET-POL.4 | The polarimeters will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-POL.5 | The polarimeters must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-POL.1 | The polarimeters, their control rooms and support system must fit within the constraints of the surrounding systems, be properly located relative to other systems, and have adequate space for the delivery of services and the removal of waste. |
P-DET-POL.2 | The polarimeters will require a structural support system to carry the cumulative weight of the detectors and peripheral services, and to distribute that load to other supporting infrastructure or to the floor, and will require survey marks to determine their physical location. |
P-DET-POL.3 | The polarimeters and their control rooms will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-POL.4 | The polarimeters and their control rooms will require electrical power to support the operation of the detector sub-components and electronics. |
P-DET-POL.5 | The polarimeters and their control rooms will require communications infrastructure to support data collection, monitoring and control. |
P-DET-POL.6 | The laser labs, control rooms and access paths must be shielded to allow personnel access during beam/laser operations. |
P-DET-POL.7 | The laser labs, control rooms, and equipment must have interlocks where required for personnel safety. |
This function not yet implemented.