Requirement Details
Electron Ion Collider
F-DET-POL-EPOL.3
Requirement details, history, relationships and interfaces associated with requirement F-DET-POL-EPOL.3
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 07/14/2023 00:00 | |||
Identifier: | F-DET-POL-EPOL.3 | WBS: | 6.10.14.01 |
Date Modified: | 07/14/2023 00:00 | TBD: | FALSE |
Status Date: | 07/14/2023 00:00 | Status: | APPROVED |
Description: | Windows are required to allow laser to enter and exit beamline vacuum. | ||
Comments: |
No archive versions
Parents | |
G-DET-POL-EPOL.1 | The EIC electron polarimeter system shall provide a measurement of the absolute beam polarization in the ESR and RCS. The ESR Compton must measure the polarization bunch-by-bunch and be sensitive to the beam transverse polarization profile. |
Children | |
No parents. |
None defined.