Requirement Details
Electron Ion Collider
F-DET-POL-EPOL-ESR.6
Requirement details, history, relationships and interfaces associated with requirement F-DET-POL-EPOL-ESR.6
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-POL-EPOL-ESR.6 | WBS: | 6.10.14.01.01 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The electron polarization measurement shall be completed in a context appropriate time frame. | ||
Comments: |
No archive versions
Parents | |
G-DET-POL-EPOL-ESR.1 | The ESR Compton shall measure the electron polarization in the electron storage ring. |
Children | |
P-DET-POL-EPOL-ESR.4 | The laser repetition rate shall match the beam frequency (25-100 MHz) and will have the capability of achieving a ~75 kHz pulse rate. |
P-DET-POL-EPOL-ESR.2 | The measurement time shall be less than the bunch lifetime in the ring (~2 minutes). |
P-DET-POL-EPOL-ESR.6 | The time response of all detectors (electron and photon) will be sufficient to resolve beam bunch (<10 ns). |
This function not yet implemented.