Requirement Details
Electron Ion Collider
P-DET-PID.5
Requirement details, history, relationships and interfaces associated with requirement P-DET-PID.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-DET-PID.5 | WBS: | 6.10.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The PID detectors and support system must fit within the constraints of the surrounding detector sub-systems and have adequate space for the delivery of services and the removal of waste. | ||
Comments: |
No archive versions
Parents | |
F-DET-PID.3 | The PID detector system and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-PID.4 | A structural support infrastructure must be provided that supports the weight of the PID detector system and peripheral equipment, and safely distributes that load to the ground. |
Children | |
No children. |
This function not yet implemented.