Requirement Details
Electron Ion Collider
P-DET-PID-BAR-DIRC.5
Requirement details, history, relationships and interfaces associated with requirement P-DET-PID-BAR-DIRC.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | P-DET-PID-BAR-DIRC.5 | WBS: | 6.10.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The PID Detector in the barrel region will require survey marks or hooks for survey tools to determine its physical location in the barrel as a whole and its sub-components. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | P-DET-PID-BAR-DIRC.5 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The PID Detector in the barrel region will require survey marks or hooks for survey tools to determine its physical location in the barrel as a whole and its sub-components. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-DET-PID-BAR-DIRC.5 | WBS: | 6.10.04 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The PID Detector in the barrel region will require survey marks or hooks for survey tools to determine its physical location in the barrel as a whole and its sub-components. | ||
Comments: |
Parents | |
F-DET-PID.3 | The PID detector system and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
Children | |
No children. |
This function not yet implemented.