Requirement Details
Electron Ion Collider
P-DET-MAG.3
Requirement details, history, relationships and interfaces associated with requirement P-DET-MAG.3
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | P-DET-MAG.3 | WBS: | 6.10.07 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The detector solenoid systems will require conventional cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. | ||
Comments: |
No archive versions
Parents | |
F-DET-MAG.2 | The EIC detector magnet will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. |
F-DET-MAG.4 | The EIC detector magnet and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
Children | |
No children. |
This function not yet implemented.