Requirement Details
Electron Ion Collider
F-DET-MAG.4
Requirement details, history, relationships and interfaces associated with requirement F-DET-MAG.4
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-DET-MAG.4 | WBS: | 6.10.07 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The EIC detector magnet and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-DET-MAG.4 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The EIC detector magnet and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-MAG.4 | WBS: | 6.10.07 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The EIC detector magnet and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Parents | |
G-DET-MAG.2 | The EIC detector magnet will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-MAG.3 | The EIC detector magnet must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-MAG.1 | The detector solenoid and supporting infrastructure must fit within the constraints of the surrounding detector sub-systems and have adequate space for the delivery of services and the removal of waste. |
P-DET-MAG.2 | The detector solenoid systems will require a structural support system to carry the cumulative weight of the detectors and peripheral services, and to distribute that load to other supporting infrastructure or to the floor. |
P-DET-MAG.3 | The detector solenoid systems will require conventional cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-MAG.4 | The detector solenoid will require cryogenic cooling infrastructure that is sufficient to maintain the solenoid cryostat temperature within an acceptable range. |
P-DET-MAG.5 | The detector solenoid will require an ice management system. |
P-DET-MAG.7 | The detector solenoid systems will require communications infrastructure to support data collection, monitoring and control. |
P-DET-MAG.6 | The detector solenoid systems will require electrical power to support the operation of the magnet and its peripheral sub-systems. |
P-DET-MAG.12 | The magnet shall provide a minimum 2.8 meter bore diameter to support insertion of the detector elements. |
This function not yet implemented.