Requirement Details
Electron Ion Collider

F-DET-MAG-CCR.1
Requirement details, history, relationships and interfaces associated with requirement F-DET-MAG-CCR.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-DET-MAG-CCR.1 | WBS: | 6.10.07.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The magnet shall require a cryocan and cryogenic line that will deliver Liquid Helium to the solenoid. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-DET-MAG-CCR.1 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The magnet shall require a cryocan and cryogenic line that will deliver Liquid Helium to the solenoid. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-DET-MAG-CCR.1 | WBS: | 6.10.07.01 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The magnet shall require a cryocan and cryogenic line that will deliver Liquid Helium to the solenoid. | ||
| Comments: | |||
| Parents | |
| G-DET-MAG.1 | The EIC detector magnet shall provide a central field, a sufficiently large room temperature bore, and a magnet length consistent with the detector need to fulfill EIC science requirements |
| Children | |
| P-DET-MAG-CCR.1 | Supercritcal helium at 4.6 K and Gaseous helium at 300K & shall be provided 50K with flow rates upto 10 g/s |
| P-DET-MAG-CCR.3 | Cryogenic supply and return shall be provided within the experimental hall and assembly hall at IP6 |
| P-DET-MAG-CCR.2 | The maximum average temperature shall be 4.7 K, 80 K & 100K during operation, shutdown and transport respectively |
| P-DET-MAG-CCR.4 | A low pressure relief valve shall be placed in the magnet side transferline to relieve pressure during transport |
This function not yet implemented.