Requirement Details
Electron Ion Collider
G-DET-INF.3
Requirement details, history, relationships and interfaces associated with requirement G-DET-INF.3
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-DET-INF.3 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | Infrastructure systems for the assembly hall shall include all power, water, environmental cooling, cryogenics, gas handling, clean compressed air delivery, space, fire protection, Helium Leak Detection, ODH Detection and any other Personnel Safety Systems, material handling and support systems required to assemble and maintain the central detector systems. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-DET-INF-ELEC.1 | All detectors require isolated power and grounding from facilities power systems. This will be accomplished from existing and newly installed Delta/Wye transformers with a single point star grounding (AKA clean or magnet ground) scheme at the WAH. |
F-DET-INF-MECH.1 | Floors in the assembly and collider hall must be adequate to support the static and moving load of the experimental detector systems. Load limits need to be determined and verified. |
This function not yet implemented.