Requirement Details
Electron Ion Collider

F-DET-INF.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-INF.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-DET-INF.5 | WBS: | 6.10.10 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-DET-INF.5 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-DET-INF.5 | WBS: | 6.10.10 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
| Comments: | |||
| Parents | |
| G-DET-INF.9 | The infrastructure systems will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
| G-DET-INF.10 | The infrastructure systems must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
| Children | |
| P-DET-INF-CRYO.1 | The cryogenic transfer system must be installed in the available space and have no interferences with new and existing infrastructure. |
| P-DET-INF-STD-MECHCLR.1 | Carbon Fiber Tube adjustments in the beampipe shall have an angular tolerance of ±1 mrad. |
| P-DET-INF-STD-MECHCLR.2 | Carbon Fiber Tube adjustments in the Barrel Emcal will be within ±5m . |
| P-DET-INF-STD-MECHCLR.3 | Carbon Fiber Tube adjustments in the STAR Cradle will be within ±~1/8” (4mm). |
| P-DET-INF-STD-MECHCLR.4 | The Carbon Fiber Tube shall be able to be located within 12 mm. |
| P-DET-INF-STD-MECHCLR.5 | The Barrel Emcal shall be able to be located within 5 mm. |
| P-DET-INF-STD-MECHCLR.6 | The STAR Cradle shall be able to be located within 4 mm. |
| P-DET-INF-STD-PIPECLR.1 | Inner Detectors will have a minimum clearance to the beampipe of 5mm all around. |
| P-DET-INF-STD-PIPECLR.2 | For Inner Detectors that will be installed over flanges then the minimum clearance will be 5mm to the flange all around. |
| P-DET-INF-STD-PIPECLR.3 | All other central detectors will have a minimum clearance to the beampipe of 10mm all around. |
| P-DET-INF-STD-PIPECLR.4 | For all other central detectors that will be installed over flanges then the minimum clearance will be 10mm to the flange all around. |
| P-DET-INF-STD-PIPECLR.5 | Endcaps will have a minimum clearance to the beampipe of 30mm all around. |
| P-DET-INF-STD-RCS.1 | Endcaps shall have cutouts to accommodate spaces needed for the RCS beampipe. The minimum clearance shall be 30mm |
| P-DET-INF-STD-RCS.2 | The RCS beampipe shall be supported by either the South Platform or the Central Barrel. |
| P-DET-INF-STD-RCS.3 | If extra steel is needed for the fringe field, then support for it shall also be provided by either the South Platform or Central Barrel. |
| P-DET-INF-STD-SVCGAP.1 | Area needed around pfRICH: 2000 cm2 + 10% = 2200 cm2 |
| P-DET-INF-STD-SVCGAP.2 | Area needed around EEEMcal: 2150cm2 + 10% = 2365 cm2 |
| P-DET-INF-STD-SVCGAP.3 | Area needed between CF tube and dRICH: 4350 cm2 + 10% = 4785 cm2 |
| P-DET-INF-STD-SVCGAP.4 | Area needed between dRICH boxes: 4800 cm2 + 10% = 5280 cm2 |
| P-DET-INF-STD-SVCGAP.5 | Area needed between dRICH and HCAL: 5650 cm2 + 10% = 6215 cm2 |
| P-DET-INF-STD-SVCGAP.6 | The central detector and infrastructure must be able to fit through the doorway between the experimental and assembly halls, which is 8.2 meters wide and 8.2 meters high. |
| P-DET-INF-STD-SVCGAP.7 | The positional tolerance of the cradle shall be within ±2mm in all directions. |
| P-DET-INF-STD-SVCGAP.8 | The adjustability of the cradle shall be at least ±25mm in the in the X,Z directions, and ±10mm in the Y direction. |
| P-DET-INF-STD-SVCGAP.9 | The positional tolerance of the of the Global Support Tube shall be within ±3mm in all directions. |
| P-DET-INF-STD-SVCGAP.10 | The adjustability of the Global Support Tube shall be at least ±10mm in all directions. |
| P-DET-INF-STD-SVCGAP.11 | The positional tolerance of the Pixel Support Tube shall be within ±1mm in all directions. |
| P-DET-INF-STD-SVCGAP.12 | The adjustability of the Pixel Support Tube shall be at least ±3mm in the X,Y directions, and ±5mm in the Z direction. |
| P-DET-INF-STD-SVCGAP.13 | The positional tolerance of the beampipe shall be within ±1mm in the X,Y directions, and ±5mm in the Z direction. |
| P-DET-INF-STD-SVCGAP.15 | The adjustability of the bellows shall be at least ±5mm in the Z direction. |
| P-DET-INF-STD-SVCGAP.14 | The rotational tolerance of the beampipe shall be within ±1mm mrad in the X, Y directions. |
| P-DET-INF-STD-SVCGAP.16 | The rotational adjustability of the flanges shall be at least ±1 degree in the X, Y directions. |
This function not yet implemented.