Requirement Details
Electron Ion Collider
F-DET-INF.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-INF.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-DET-INF.5 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-DET-INF.5 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-INF.5 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The infrastructure systems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Parents | |
G-DET-INF.9 | The infrastructure systems will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-INF.10 | The infrastructure systems must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-INF-CRYO.1 | The cryogenic transfer system must be installed in the available space and have no interferences with new and existing infrastructure. |
P-DET-INF-STD-MECHCLR.1 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-MECHCLR.2 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-MECHCLR.3 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-MECHCLR.4 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-MECHCLR.5 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-MECHCLR.6 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-PIPECLR.1 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-PIPECLR.2 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-PIPECLR.3 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-PIPECLR.4 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-PIPECLR.5 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-RCS.1 | Bolts with a safety factor of 2 or greater will be generally accepted and will not require further review. |
P-DET-INF-STD-RCS.2 | The RCS beampipe shall be supported by either the South Platform or the Central Barrel. |
P-DET-INF-STD-RCS.3 | If extra steel is needed for the fringe field, then support for it shall also be provided by either the South Platform or Central Barrel. |
P-DET-INF-STD-SVCGAP.1 | Area needed around pfRICH: 2000 cm2 + 10% = 2200 cm2 |
P-DET-INF-STD-SVCGAP.2 | Area needed around EEEMcal: 2150cm2 + 10% = 2365 cm2 |
P-DET-INF-STD-SVCGAP.4 | Area needed between dRICH boxes: 4800 cm2 + 10% = 5280 cm2 |
P-DET-INF-STD-SVCGAP.3 | Area needed between CF tube and dRICH: 4350 cm2 + 10% = 4785 cm2 |
P-DET-INF-STD-SVCGAP.5 | Area needed between dRICH and HCAL: 5650 cm2 + 10% = 6215 cm2 |
This function not yet implemented.