Requirement Details
Electron Ion Collider
P-DET-INF-MECH.2
Requirement details, history, relationships and interfaces associated with requirement P-DET-INF-MECH.2
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 11/01/2023 00:00 | |||
Identifier: | P-DET-INF-MECH.2 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | A rail system for the Hadron end cap calorimeters shall be installed that is sufficient to carry 600ton and maintain a free center gap of 10 centimeters. | ||
Comments: |
No archive versions
Parents | |
F-DET-INF-MECH.1 | Floors in the assembly and collider hall must be adequate to support the static and moving load of the experimental detector systems. Load limits need to be determined and verified. |
Children | |
No children. |
This function not yet implemented.