Requirement Details
Electron Ion Collider
P-DET-INF-MECH.1
Requirement details, history, relationships and interfaces associated with requirement P-DET-INF-MECH.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | P-DET-INF-MECH.1 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The floor, rails and cradle shall be capable of supporting a static or moving load of 1200 tons (central detector). | ||
Comments: |
No archive versions
Parents | |
F-DET-INF-MECH.1 | Floors in the assembly and collider hall must be adequate to support the static and moving load of the experimental detector systems. Load limits need to be determined and verified. |
Children | |
No children. |
This function not yet implemented.