Requirement Details
Electron Ion Collider
F-DET-INF-MECH.1
Requirement details, history, relationships and interfaces associated with requirement F-DET-INF-MECH.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-INF-MECH.1 | WBS: | 6.10.10 |
Date Modified: | TBD: | TRUE | |
Status Date: | Status: | APPROVED | |
Description: | Floors in the assembly and collider hall must be adequate to support the static and moving load of the experimental detector systems. Load limits need to be determined and verified. | ||
Comments: |
No archive versions
Parents | |
G-DET-INF.3 | Infrastructure systems for the assembly hall shall include all power, water, environmental cooling, cryogenics, gas handling, clean compressed air delivery, space, fire protection, Helium Leak Detection, ODH Detection and any other Personnel Safety Systems, material handling and support systems required to assemble and maintain the central detector systems. |
G-DET-INF.4 | Infrastructure systems for the collider hall shall include all power, water, environmental cooling, cryogenics, gas handling, clean compressed air delivery, space, fire protection, Helium Leak Detection, ODH Detection and any other Personnel Safety Systems, Cryo Protection, material handling and support systems required to operate the entire detector systems. |
Children | |
P-DET-INF-MECH.1 | The floor, rails and cradle shall be capable of supporting a static or moving load of 1200 tons (central detector). |
P-DET-INF-MECH.2 | A rail system for the Hadron end cap calorimeters shall be installed that is sufficient to carry 600ton and maintain a free center gap of 10 centimeters. |
P-DET-INF-MECH.3 | A rail system for the Lepton end cap calorimeters shall be installed that is sufficient to carry 400ton and maintain a free center gap of 10 centimeters. |
This function not yet implemented.