Requirement Details
Electron Ion Collider
F-DET-INF-ELEC.1
Requirement details, history, relationships and interfaces associated with requirement F-DET-INF-ELEC.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 07/14/2023 00:00 | |||
Identifier: | F-DET-INF-ELEC.1 | WBS: | 6.10.10 |
Date Modified: | 07/14/2023 00:00 | TBD: | FALSE |
Status Date: | 07/14/2023 00:00 | Status: | APPROVED |
Description: | All detectors require isolated power and grounding from facilities power systems. This will be accomplished from existing and newly installed Delta/Wye transformers with a single point star grounding (AKA clean or magnet ground) scheme at the WAH. | ||
Comments: |
No archive versions
Parents | |
G-DET-INF.4 | Infrastructure systems for the interaction region shall include all power, water, environmental cooling, cryogenics, gas handling, space, material handling and support systems required to assemble, operate and maintain the far forward and far backward detector systems. |
G-DET-INF.3 | Infrastructure systems for the collider hall shall include all power, water, environmental cooling, cryogenics, gas handling, space, material handling and support systems required to operate the entire detector systems. |
G-DET-INF.2 | Infrastructure systems for the assembly hall shall include all power, water, environmental cooling, cryogenics, gas handling, space, material handling and support systems required to assemble and maintain the central detector systems. |
Children | |
No parents. |
None defined.