Requirement Details
Electron Ion Collider
F-DET-INF-CRYO.1
Requirement details, history, relationships and interfaces associated with requirement F-DET-INF-CRYO.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-INF-CRYO.1 | WBS: | 6.10.10 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | A cryogenic transfer system shall be provided within the collider hall to allow cryogenic distribution for the experimental solenoid. | ||
Comments: |
No archive versions
Parents | |
G-DET-INF.4 | Infrastructure systems for the collider hall shall include all power, water, environmental cooling, cryogenics, gas handling, clean compressed air delivery, space, fire protection, Helium Leak Detection, ODH Detection and any other Personnel Safety Systems, Cryo Protection, material handling and support systems required to operate the entire detector systems. |
Children | |
P-DET-INF-CRYO.1 | The cryogenic transfer system must be installed in the available space and have no interferences with new and existing infrastructure. |
P-DET-INF-CRYO.2 | The cryogenic transfer system will have a support structure and connectors that allow the central detector to be relocated between the experimental hall and the assembly area without disconnection. |
P-DET-INF-CRYO.3 | The cryogenic system shall provide a flow rate of XX g/s to the experimental solenoid. |
This function not yet implemented.