Requirement Details
Electron Ion Collider
P-DET-ELEC.2
Requirement details, history, relationships and interfaces associated with requirement P-DET-ELEC.2
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | P-DET-ELEC.2 | WBS: | 6.10.08 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The electronics systems will require a structural support system to deliver cabling and services throughout the experimental hall and control room. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | P-DET-ELEC.2 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The electronics systems will require a structural support system to deliver cabling and services throughout the experimental hall and control room. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-DET-ELEC.2 | WBS: | 6.10.08 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The electronics systems will require a structural support system to deliver cabling and services throughout the experimental hall and control room. | ||
Comments: |
Parents | |
F-DET-ELEC.9 | The EIC detector readout electronics and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-ELEC.10 | A structural support infrastructure must be provided that supports the weight of the EIC detector readout electronics and peripheral equipment, and safely distributes that load to the ground. |
Children | |
No children. |
This function not yet implemented.