Requirement Details
Electron Ion Collider
G-DET-ELEC.3
Requirement details, history, relationships and interfaces associated with requirement G-DET-ELEC.3
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | G-DET-ELEC.3 | WBS: | 6.10.08 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The EIC detector readout electronics will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-DET-ELEC.7 | The EIC detector readout electronics will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. |
F-DET-ELEC.8 | The configuration of the EIC detector readout electronics within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
F-DET-ELEC.9 | The EIC detector readout electronics and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-ELEC.10 | A structural support infrastructure must be provided that supports the weight of the EIC detector readout electronics and peripheral equipment, and safely distributes that load to the ground. |
This function not yet implemented.