Requirement Details
Electron Ion Collider
F-DET-ELEC.7
Requirement details, history, relationships and interfaces associated with requirement F-DET-ELEC.7
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-ELEC.7 | WBS: | 6.10.08 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The EIC detector readout electronics will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
Comments: |
No archive versions
Parents | |
G-DET-ELEC.3 | The EIC detector readout electronics will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET-ELEC.3 | The electronics systems will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-ELEC.5 | The electronics systems will require communications infrastructure that will be used to support data collection, monitoring and control. |
P-DET-ELEC.4 | The electronics systems will require a source of electrical power that will energize local devices and be distributed to other detectors and systems. |
P-DET-ELEC.6 | The electronics systems must be shielded against the effects of electromagnetic interference, radiation, and other external influences that may impact their performance. |
This function not yet implemented.