Requirement Details
Electron Ion Collider
P-DET-ECAL.1
Requirement details, history, relationships and interfaces associated with requirement P-DET-ECAL.1
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | P-DET-ECAL.1 | WBS: | 6.10.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The EMCal detectors and support system must fit within the constraints of the surrounding detector sub-systems and have adequate space for the delivery of services and the removal of waste. | ||
Comments: |
No archive versions
Parents | |
F-DET-ECAL.9 | The configuration of the EMCAL subsystems within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
F-DET-ECAL.10 | The EMCAL subsystems and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-ECAL.11 | A structural support infrastructure must be provided that supports the weight of the EMCAL subsystems and peripheral equipment, and safely distributes that load to the ground. |
Children | |
No children. |
This function not yet implemented.