Requirement Details
Electron Ion Collider
F-DET-ECAL.8
Requirement details, history, relationships and interfaces associated with requirement F-DET-ECAL.8
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-ECAL.8 | WBS: | 6.10.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The EMCAL subsystems will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
Comments: |
No archive versions
Parents | |
G-DET-ECAL.3 | The EMCAL subsystems will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET-ECAL.3 | The EMCal systems will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-ECAL.4 | The EMCal systems will require electrical power to support the operation of the detector sub-components and electronics. |
P-DET-ECAL.5 | The EMCal systems will require communications infrastructure to support data collection, monitoring and control. |
P-DET-ECAL.8 | The monitoring system shall contain: Light system (LED or laser), test pulse (for electronics), dark current (for SiPM). |
This function not yet implemented.