Requirement Details
Electron Ion Collider
P-DET-ECAL-BCK.6
Requirement details, history, relationships and interfaces associated with requirement P-DET-ECAL-BCK.6
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | P-DET-ECAL-BCK.6 | WBS: | 6.10.05 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | System shall have low material budget on the way from the vertex: <5%X0 in the 1st half a way, or <10%X0 on the second half a way, or <30%X0 just in front of EMCal (within 10cm). | ||
Comments: |
No archive versions
Parents | |
F-DET-ECAL.9 | The configuration of the EMCAL subsystems within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
Children | |
No children. |
This function not yet implemented.