Requirement Details
Electron Ion Collider
P-DET-COMP.9
Requirement details, history, relationships and interfaces associated with requirement P-DET-COMP.9
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | P-DET-COMP.9 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | DAQ Room resources shall sit on a raised floor to allow for forced air, power and signal cabling to be routed to all racks. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | P-DET-COMP.9 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | DAQ Room resources shall sit on a raised floor to allow for forced air, power and signal cabling to be routed to all racks. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | P-DET-COMP.9 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | DAQ Room resources shall sit on a raised floor to allow for forced air, power and signal cabling to be routed to all racks. | ||
Comments: |
Parents | |
F-DET-COMP.13 | The configuration of the DAQ subsystem within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
Children | |
No children. |
This function not yet implemented.