Requirement Details
Electron Ion Collider
G-DET-COMP.6
Requirement details, history, relationships and interfaces associated with requirement G-DET-COMP.6
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-DET-COMP.6 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem must fit within the available space in the experimental hall, assembly hall, and control rooms, and be consistent with the available infrastructure and resources. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-DET-COMP.1 | DAQ related resources shall require physical space in the experimental hall (e.g. electronics racks). In the experimental hall multiple designated locations must be available to provide necessary proximity to all instrumented DET systems. |
F-DET-COMP.2 | DAQ related resources shall require physical space within the "counting house". A single separated closed space for computing resources (DAQ Room) shall be required in addition to a User occupied operations space (Control room). |
F-DET-COMP.14 | The DAQ subsystem and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-COMP.13 | The configuration of the DAQ subsystem within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
F-DET-COMP.15 | A structural support infrastructure must be provided that supports the weight of the DAQ subsystem and peripheral equipment, and safely distributes that load to the ground. |
This function not yet implemented.