Requirement Details
Electron Ion Collider
G-DET-COMP.5
Requirement details, history, relationships and interfaces associated with requirement G-DET-COMP.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | G-DET-COMP.5 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | G-DET-COMP.5 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-DET-COMP.5 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. | ||
Comments: |
Parents | |
No parents. | |
Children | |
F-DET-COMP.1 | DAQ related resources shall require physical space in the experimental hall (e.g. electronics racks). In the experimental hall multiple designated locations must be available to provide necessary proximity to all instrumented DET systems. |
F-DET-COMP.2 | DAQ related resources shall require physical space within the "counting house". A single separated closed space for computing resources (DAQ Room) shall be required in addition to a User occupied operations space (Control room). |
F-DET-COMP.3 | The DAQ subsystem shall be designed to operate continuously, independent of the state of the other detector subsystems. |
F-DET-COMP.5 | DAQ Room computing shall have an alternate power source available that is battery or generator backed-up for a subset of core resources in case of power outages. |
F-DET-COMP.6 | The DAQ system will provide resources for communication with DET subsystems via fiber links between the experimental hall and the DAQ room. |
F-DET-COMP.12 | The DAQ subsystem will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. |
F-DET-COMP.14 | The DAQ subsystem and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-COMP.13 | The configuration of the DAQ subsystem within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
F-DET-COMP.15 | A structural support infrastructure must be provided that supports the weight of the DAQ subsystem and peripheral equipment, and safely distributes that load to the ground. |
This function not yet implemented.