Requirement Details
Electron Ion Collider
G-DET-COMP.1
Requirement details, history, relationships and interfaces associated with requirement G-DET-COMP.1
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-DET-COMP.1 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem shall consist of all resources necessary to communicate with all DET subsystems in order to configure, control and monitor these systems as well as read, process and store data they generate. | ||
Comments: |
No archive versions
Parents | |
No parents. | |
Children | |
F-DET-COMP.3 | The DAQ subsystem shall be designed to operate continuously, independent of the state of the other detector subsystems. |
F-DET-COMP.7 | The Data Acquisition system will support triggerless (streaming) readout of all DET subsystems as part of normal operation. Asynchronous (triggered) readout from front-end systems will also be supported as an option. |
F-DET-COMP.8 | The DAQ system will support independent and simultaneous operation (configuration, control and readout) from multiple DET sub-systems. |
F-DET-COMP.10 | There will be sufficient online processing and networking resources to manage the full DET subsystem output for purposes of zero suppression, primary noise and background filtering as well as event identification for purposes of filtering non-physics related signals. |
F-DET-COMP.9 | All DAQ system communication with DET subsystems will be supported through proprietary fiber-based links. This includes distribution of a system-wide common clock that can be used to synchronize all DET subsystems. This also includes configuration and monitoring of all DET subsystem front end electronics. |
F-DET-COMP.11 | Global Timing Unit (GTU) wil provide common timing information to all DET sub systems. |
This function not yet implemented.