Requirement Details
Electron Ion Collider
F-DET-COMP.14
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP.14
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-DET-COMP.14 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-DET-COMP.14 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The DAQ subsystem and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-COMP.14 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The DAQ subsystem and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. | ||
Comments: |
Parents | |
G-DET-COMP.5 | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-COMP.6 | The DAQ subsystem must fit within the available space in the experimental hall, assembly hall, and control rooms, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-COMP.1 | The DAQ systems, their support systems, enclosures, and distribution systems must fit within the space constraints of their areas of installation, and leave adequate space for the delivery of other services and the removal of waste. |
P-DET-COMP.3 | The DAQ systems will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
P-DET-COMP.2 | The DAQ systems will require consoles, cabinets, and structural support systems to hold equipment and deliver cabling and services throughout the experimental hall, control room, and to locations in the interaction region. |
P-DET-COMP.4 | The DAQ systems will require electrical power to support the operation of the detector sub-components and electronics. |
This function not yet implemented.