Requirement Details
Electron Ion Collider
F-DET-COMP.13
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP.13
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-COMP.13 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The configuration of the DAQ subsystem within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. | ||
Comments: |
No archive versions
Parents | |
G-DET-COMP.5 | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
G-DET-COMP.6 | The DAQ subsystem must fit within the available space in the experimental hall, assembly hall, and control rooms, and be consistent with the available infrastructure and resources. |
Children | |
P-DET-COMP.1 | The DAQ systems, their support systems, enclosures, and distribution systems must fit within the space constraints of their areas of installation, and leave adequate space for the delivery of other services and the removal of waste. |
P-DET-COMP.7 | All DAQ services in the experimental hall must be adequately shielded from prompt radiation from the beam crossing region of the EIC detector to minimize electronics failures. |
P-DET-COMP.8 | User management of required cabling shall be facilitated via a combination of cable trays and/or conduit or rigging between the DAQ room patch panels and the experimental hall areas where DAQ and general network fibers are required. |
P-DET-COMP.9 | DAQ Room resources shall sit on a raised floor to allow for forced air, power and signal cabling to be routed to all racks. |
This function not yet implemented.