Requirement Details
Electron Ion Collider

F-DET-COMP.12
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP.12
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-DET-COMP.12 | WBS: | 6.10.09 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The DAQ subsystem will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-DET-COMP.12 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | The DAQ subsystem will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-DET-COMP.12 | WBS: | 6.10.09 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | The DAQ subsystem will require adequate infrastructure resources (i.e. power, cooling, cryogens, etc.) to ensure it can function reliably during continous operations. | ||
| Comments: | |||
| Parents | |
| G-DET-COMP.5 | The DAQ subsystem will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
| Children | |
| P-DET-COMP.3 | The DAQ systems will require cooling infrastructure that is sufficient to ensure the operating temperature remains within an acceptable range. |
| P-DET-COMP.4 | The DAQ systems will require electrical power to support the operation of the detector sub-components and electronics. |
| P-DET-COMP.5 | All DAQ powered services in the experimental hall and counting house must have access to either 120V AC or 208V AC three phase power. |
| P-DET-COMP.10 | DAQ Room computing shall require electrical power via raised floor distribution sufficient to support XX kW total power usage levels. |
| P-DET-COMP.6 | All DAQ services in the experimental hall must have access to a "clean" ground to maintain good signal quality. |
| P-DET-COMP.11 | DAQ Room computing shall require HVAC cooling via raised floor distribution sufficient to support a XX kW power outlay at tempuratures at or below 76 degrees Fahrenheit. |