Requirement Details
Electron Ion Collider
F-DET-COMP-SC.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP-SC.5
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | F-DET-COMP-SC.5 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | Slow Controls will provide electromechanical interlocks for the DET subsystems. | ||
Comments: |
No archive versions
Parents | |
G-DET-COMP-SC.1 | The DET that will require a slow control system that provides system interlocks, interfaces, monitoring, and control. |
Children | |
P-DET-COMP-SC.11 | All interlocks will be reported in the alarm chain with a priority level of low or high. |
P-DET-COMP-SC.12 | Interlock controllers and remote IO will maintain standard operation in the event of a network and/or power outage. |
P-DET-COMP-SC.13 | Interlocks will be meet a minimum performance level (PL) appropriate for the system to be interlocked. |
This function not yet implemented.