Requirement Details
Electron Ion Collider

F-DET-COMP-SC.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP-SC.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 03/02/2026 15:19 | |||
| Identifier: | F-DET-COMP-SC.5 | WBS: | 6.03.01.08 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Slow Controls will provide electromechanical interlocks for the DET subsystems. | ||
| Comments: | |||
| Record Date: 05/16/2025 17:04 | |||
| Identifier: | F-DET-COMP-SC.5 | WBS: | 6.10.09 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Slow Controls will provide electromechanical interlocks for the DET subsystems. | ||
| Comments: | |||
| Record Date: 05/15/2025 20:34 | |||
| Identifier: | F-DET-COMP-SC.5 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | ||
| Description: | Slow Controls will provide electromechanical interlocks for the DET subsystems. | ||
| Comments: | |||
| Record Date: 01/27/2025 16:43 | |||
| Identifier: | F-DET-COMP-SC.5 | WBS: | 6.10.09 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Slow Controls will provide electromechanical interlocks for the DET subsystems. | ||
| Comments: | |||
| Parents | |
| G-DET-COMP-SC.1 | The DET that will require a slow control system that provides system interlocks, interfaces, monitoring, and control. |
| Children | |
| P-DET-COMP-SC.12 | Interlock controllers and remote IO will maintain standard operation in the event of a network and/or power outage. |
| P-DET-COMP-SC.11 | All interlocks will be reported in the alarm chain with a priority level of low or high. |
| P-DET-COMP-SC.13 | Interlocks will be meet a minimum performance level (PL) appropriate for the system to be interlocked. |
This function not yet implemented.