Requirement Details
Electron Ion Collider
F-DET-COMP-SC.2
Requirement details, history, relationships and interfaces associated with requirement F-DET-COMP-SC.2
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-DET-COMP-SC.2 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | Shared hardware and software computing components will be available for Slow Controls configuration, operation, monitoring and mangement. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-DET-COMP-SC.2 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | Shared hardware and software computing components will be available for Slow Controls configuration, operation, monitoring and mangement. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-COMP-SC.2 | WBS: | 6.10.09 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | Shared hardware and software computing components will be available for Slow Controls configuration, operation, monitoring and mangement. | ||
Comments: |
Parents | |
G-DET-COMP-SC.1 | The DET that will require a slow control system that provides system interlocks, interfaces, monitoring, and control. |
Children | |
P-DET-COMP-SC.2 | Enough computing hardware will be made available for all DET subsytems to run a minimum of 20 input/output controllers (IOCs) to encapsulate subsystem performance. |
This function not yet implemented.