Requirement Details
Electron Ion Collider
P-DET-ANC.2
Requirement details, history, relationships and interfaces associated with requirement P-DET-ANC.2
- CURRENT RECORD
- ARCHIVE RECORDS
- RELATIONSHIPS
- INTERFACES
Record Date: 10/10/2024 00:00 | |||
Identifier: | P-DET-ANC.2 | WBS: | 6.10.11 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | APPROVED | |
Description: | The ancillary systems will require a structural support system to carry the cumulative weight of the detectors and peripheral services, and to distribute that load to other supporting infrastructure or to the floor, and will require survey marks to determine their physical location. | ||
Comments: |
No archive versions
Parents | |
F-DET-ANC.8 | The EIC ancillary detectors and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-ANC.9 | A structural support infrastructure must be provided that supports the weight of the EIC ancillary detectors and peripheral equipment, and safely distributes that load to the ground. |
Children | |
No children. |
This function not yet implemented.