Requirement Details
Electron Ion Collider
G-DET-ANC.5
Requirement details, history, relationships and interfaces associated with requirement G-DET-ANC.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | G-DET-ANC.5 | WBS: | 6.10.11 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The EIC ancillary detectors must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | G-DET-ANC.5 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | The EIC ancillary detectors must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | G-DET-ANC.5 | WBS: | 6.10.11 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | The EIC ancillary detectors must fit within the available space in the experimental hall, and be consistent with the available infrastructure and resources. | ||
Comments: |
Parents | |
No parents. | |
Children | |
F-DET-ANC-B0.3 | B0-system must fit and be integrated into the warm area of the B0-dipole. The B0-systems shall require appropriate power and cabling to support operation of the detector elements.Should have survey marks to determine their physical location |
F-DET-ANC-LOWQ2.4 | Low-Q² tagger will be positioned next to the outgoing electron beampipe, between the B2eR dipole and Q3eR quadrupole. |
F-DET-ANC.8 | The EIC ancillary detectors and its support systems must fit in the available space AND provide adequate plenums and pathways for the delivery of services, resources and communications, and for the removal of heat and waste during operations. |
F-DET-ANC.7 | The configuration of the EIC ancillary detectors within the detector will be coordinated to ensure efficient operation and to minimize adverse interactions between sub-systems. |
F-DET-ANC.9 | A structural support infrastructure must be provided that supports the weight of the EIC ancillary detectors and peripheral equipment, and safely distributes that load to the ground. |
This function not yet implemented.