Requirement Details
Electron Ion Collider
F-DET-ANC-LOWQ2.5
Requirement details, history, relationships and interfaces associated with requirement F-DET-ANC-LOWQ2.5
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
Record Date: 05/16/2025 17:04 | |||
Identifier: | F-DET-ANC-LOWQ2.5 | WBS: | 6.10.11 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | LowQ2 system must operate at a full projected EIC luminosity | ||
Comments: |
Record Date: 05/15/2025 20:34 | |||
Identifier: | F-DET-ANC-LOWQ2.5 | WBS: | |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | ||
Description: | LowQ2 system must operate at a full projected EIC luminosity | ||
Comments: |
Record Date: 01/27/2025 16:43 | |||
Identifier: | F-DET-ANC-LOWQ2.5 | WBS: | 6.10.11 |
Date Modified: | TBD: | FALSE | |
Status Date: | Status: | Approved | |
Description: | LowQ2 system must operate at a full projected EIC luminosity | ||
Comments: |
Parents | |
G-DET-ANC.4 | The EIC ancillary detectors will be functionally integrated with the other detectors, with the interaction region components, and with the facility infrastructure. |
Children | |
P-DET-ANC-LOWQ2.6 | Low- Q² tagger will be able to measure the momentum of more than 10 electrons per bunch crossing. |
P-DET-ANC-LOWQ2.14 | The Low-Q2 detectors must handle a data rate and operate reliably at a full projected EIC luminosity. |
P-DET-ANC-LOWQ2.9 | The position of the Low-Q² tracker should be removable and adjustable to accommodate different running conditions. |
P-DET-ANC-LOWQ2.16 | The performance of the Low-Q2 detector will be dependent on the characteristics of the electron beam pipe exit window. |
This function not yet implemented.