Requirement Details
Electron Ion Collider

P-CTS-CRYO-2K-SAT08.02.08
Requirement details, history, relationships and interfaces associated with requirement P-CTS-CRYO-2K-SAT08.02.08
CURRENT RECORD
ARCHIVE RECORDS
RELATIONSHIPS
INTERFACES
| Record Date: 11/02/2026 18:39 | |||
| Identifier: | P-CTS-CRYO-2K-SAT08.02.08 | WBS: | 6.05.02.02.03 |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Should there be a failure of any component in the cold box, the cold box vacuum vessel shall be equipped with a relief device sized to handle 125% of the flow from the cold box high pressure supply at the maximum design capacity. | ||
| Comments: | |||
| Record Date: 10/27/2026 00:02 | |||
| Identifier: | P-CTS-CRYO-2K-SAT08.02.08 | WBS: | |
| Date Modified: | TBD: | FALSE | |
| Status Date: | Status: | Approved | |
| Description: | Should there be a failure of any component in the cold box, the cold box vacuum vessel shall be equipped with a relief device sized to handle 125% of the flow from the cold box high pressure supply at the maximum design capacity. | ||
| Comments: | |||
| Parents | |
| No parents. | |
| Children | |
| No children. |
This function not yet implemented.